Leave Your Message

GR7 Titanium Plate (Ti-0.2Pd) - Top Corrosion Resistance by China Suppliers & Factory - ASTM B265 Available

Discover the highest corrosion resistance available among all commercially pure titanium grades, now offered by top suppliers in China. Our palladium-alloyed titanium exhibits exceptional durability, even in challenging environments such as reducing acids, hot chlorides, and severe crevice situations where conventional grades like GR2 and GR12 fail to perform. We have ASTM B265 in stock, with thicknesses ranging from 1.0 to 13 mm, ready for immediate shipment from our factory.

ISO 9001:2015 Certified  |  Rm ≥ 345 MPa  |  Pd 0.12–0.25 wt%  |  EN 10204 3.1 MTC  |  ASME SB-265  |  Ready to Ship Worldwide

    View All Titanium Products

    Frequently Asked Questions

    What grades of titanium products are available?

    We supply commercially pure titanium (Grades 1, 2, 3, 4) and alloyed grades such as Grade 5 (Ti-6Al-4V), Grade 7, Grade 9, Grade 12, and Grade 23 (ELI) to meet diverse industrial, medical, and aerospace standards.

    What quality and manufacturing standards do your products adhere to?

    Our titanium materials conform to internationally recognized standards including ASTM (B265, B348, B338, B861), AMS, ASME, and ISO certifications, supported by complete Mill Test Certificates (MTC).

    Can titanium products be customized to specific dimensions?

    Yes, we provide custom cutting, slitting, forging, and CNC precision machining services tailored to your technical drawings and exact dimensional requirements.

    Which industries primarily use these titanium products?

    Titanium mill and machined products are widely used in aerospace, chemical processing, marine engineering, medical implants, automotive, energy, and power generation due to their high strength-to-weight ratio and corrosion resistance.

    What is the standard lead time for titanium orders?

    Standard sizes in stock are ready for dispatch within 3 to 7 working days. Custom dimensions, forgings, or specialized CNC machined parts typically require 2 to 4 weeks depending on production volume.